Older floors and hall transitions can also be preserved in the long term through proper renovation.
The first joint profiles were installed in 2013 and since then many metres of FloorBridge® joint profiles have been installed both in production and in the warehouse.
Only the joint areas where the forklift actually drives get rehabilitated
.